Project name: Designing, constructing and assemblying a waste water treatment system of slaughterhouse.
Investor: Sagri
Capacity: 500 m3/day
Starting: December 2016
Project name: Designing, constructing and assemblying a treatment facility for factory effluent and sludge.
Investor: Green Saigon Bio-technology Co.,LTD.
Capacity: 500 m3/day
Project name: Designing and constructing a pig waste treatment system for 4,000 pigs.
Investor: Bach Le pig farm
Capacity: 184 m3/day
Project name: Designing, constructing and assemblying a waste water treatment system for the high school.
Investor: Thoi Tam Thon high School.
Capacity: 35 m3/day
Project name: Designing, fabricating and assembling a waste water treatment system for 5 local hospitals.
Investor: Soc Trang province Department of Natural Resources and Environment.
Capacity: 3 m3/day
Project name: Designing, constructing and assemblying a waste water treatment system for this plastic recycling factory.
Investor: Loi Dat Lai enterprise .
Capacity: 100 m3/day
Project name: Designing, constructing and assembling a waste water treatment and drainage system for this social networking center .
Investor: Soc Trang province Department of Natural Resources and Environment.
Capacity: 20 m3/day